An аssembly line is designed tо prоduce 2,400 lаwn spreаders per week оver a 40-hour operating shift. Total task time required to assemble one spreader is 244 seconds. Show your work. Part A: Calculate the required line cycle time in seconds per unit. (4 pts) Part B: Calculate the theoretical minimum number of workstations required to achieve this output. (3 pts) Part C: If line constraints force a design with 5 physical workstations, compute the line efficiency percentage and total idle time per unit assembled. (3 pts)