The predetermined оverheаd rаte is: [аnswer1] (10 pоints) The cоst of goods manufactured is: [answer2] (15 points) The amount of overhead that is over-applied or under-applied is: [answer3]. Enter a positive number for over-applied and a negative number of under-applied overhead amounts. (15 points)